top of page
PITCH DECK
FINANCIALS
An office equipped with suitable tools to form the team and going through scenarios how to design the program and start building up the system both administratively, Physically and technically. Sum of 20.000,0 euro is estimated as to build the minimum requirement to reach to the viability and feasibility report.
bottom of page